top of page

Staging
For any outside performance a raised covered stage must be provided. Failure to do so can cause cancellation.
​
Power
For any performance 3 seperate 120 volt, 20 amp power circuits (NOT just outlets). Power source needs to be within 20ft. of the stage.
Stage Access
Stage should be readily accessible for equipment load-in. Backstage should be secure and not accessible to audience.
Loading in and out
Load in time required: 3 hours
Sound check: 30 minutes
Load out time: 2 hours
​
bottom of page